Project diary: opening up a main floor without losing the ceiling line

June 28, 2026

Open-concept main floor framing before drywall

The ask was simple to say and harder to build: remove the wall between the kitchen and living room and keep a flat, unbroken ceiling.

We temporarily supported the joists, dropped in the beam, and flush-framed it so no bulkhead was needed across the span. The stairwell was rebuilt at the same time to square up the opening.

Boarding followed straight after inspection, with back-blocking at the beam line so the future crack you always see there never shows up.

Taped, sanded and handed over paint-ready — one crew, one schedule.

Stairwell framing rebuilt during renovation
Stairwell framing rebuilt during renovation
Vaulted great room finished in smooth drywall
Vaulted great room finished in smooth drywall

Why homeowners choose JCA Construction

  • · TrustedPros 2021 award winner for commitment to excellence, rated 4.3/5.
  • · One accountable crew from demolition and framing through to final sand.
  • · Free estimates and fixed written pricing with HST shown clearly.
  • · Clean, protected jobsites and completion dates we actually hit.
Request Free Estimate